| | | | |
|---|
| Check the capacity of the EnerGEO Platform to host Catalog and Metadata for GEOSS Registry process | | EnerGEO (Manfred) with Mines ParisTech (Lionel) | 50 | ISO Metadata successfully created within the EnerGEO OGC CSW | | Graphical User Interface design of the Visualization Tool (Portlet) in the GENESIS platform | | GENESIS (Marc and Steven) and MinesParisTech (Benoit, Lionel) | 25 | First demo Portlet successfully deployed. | | Deploy and test OGC WMS and WPS to ensure a proper integration in the GENESIS Platform | | Mines ParisTech (Benoit) with support of GENESIS (Jef, Simone and Steven) | 25 | First WMS deploy test successful. GENESIS Toolbox successfully tested towards WPS. | | Energy Scenario Wiring Diagram | Wiring-Diagram | Lionel Menard | 75 | Request for Approval |
Showing 4 items
Attachments (1)
-
AIP-3-Energy-Wiring-Diagram-V1.pptx - on Jul 21, 2010 6:49 AM by lionel menard (version 1)
365k
View Download
|